SCHOOL FACILITY NORTH YORK, TORONTO

The existing single sheet serpentine fill media was plugged with scale and the interior of the tower had severe scale build up and some corrosion. The scope of work was to remove and dispose of the existing plugged fill media and sand blast the interior of the cooling tower, and to caulk all interior seams […]
CALL CENTRE, TORONTO

Customer was considering replacing this 1983 BAC Forced Draft cooling tower. The existing tower had the original corrugated fill media and the spray system had been upgraded with OEM medium sized spray nozzles. The existing steel drift eliminators were coated with hard scale deposits and the interior of the tower had some corrosion evident in […]
HIGH RISE OFFICE BUILDING, WESTERN CANADA

The customer’s requirements were to replace and increase the capacity of four closed circuit coolers located on the roof of a downtown hi-rise office tower. The challenge was that crane access was restricted to a rail tram track used for city transportation and extensive over head power cable. Crane cost was huge. Due to the […]